[1]
Memon, A.H., abdul Rahman, I., abdullah, M.R. and Abdul Aziz, A.A. 2011. Time Overrun in Construction Projects from the Perspective of Project Management Consultant (PMC). Journal of Surveying, Construction and Property. 2, 1 (Jun. 2011). DOI:https://doi.org/10.22452/jscp.vol2no1.4.